Renovation Project
Energy Efficient
Whistler, BC
ENVIRONMENTAL CONSIDERATIONS INCLUDING ENERGY EFFICIENCY
- New window was ES rated
- LED lighting replace incandescent
- Building envelope R values increased where possible
- Air barrier tightened up where possible
Project Photo Gallery
COMPATIBILITY OF DESIGN WITH EXISTING STRUCTURE
- Purpose of renovation was to upgrade and improve functionality of existing bath and games room and modernize look and feel of hallway and bedrooms
- No interior walls were moved
- Existing underused bar area and millwork redesigned with better use of space and improved lighting
- Bath layout incorporated large corner post in millwork to create a balanced feel
Efficient Use of Space
- Underutilized games/pool table room redesigned as comfortable well lit quiet reading and TV room.
- Existing rarely used bathroom redesigned as guest bath to include storage for linen and towels, and large bright walk in shower
Creativity & Finishing Details
- Dark finishes replaced with lighter colours to create more inviting space
- Bedroom outlets converted to switched plugs to improve lighting ergonomics
- Lighting improved in all rooms
- Larger window in bath
- Dark wood finish in cabinets and slate floors offsets lighter paint finishes
- Drop ceiling over toilet area hides existing duct work , this line is mirrored on the floor with pebble tiles to match the shower floor.
- Heated floors in bath and hall took chill off basement feel
SIMILAR PROJECTS WE'VE DONE
Mountain Retreat
Nestled in the woods in Whistler, BC, this renovation project took a dark, dated, and poorly maintained log home and made it into a bright ...
View Project
Spearhead Drive
This custom home project was a 3-storey 1000 sq. ft. rental unit which was last updated in 1989.
View Project
Get In Touch With Us Today
Have questions? Want to get in touch to chat?
We’re available and ready to connect.